Short answer: U.S. 1 and Malabar Road are state roads in Malabar, and FDOT plans to repave southbound U.S. 1 ($3.2 million) and Malabar Road from Babcock Street to U.S. 1 ($4 million), both with a letting date of July 7, 2027. The Town of Malabar keeps a list of accepted town streets, scheduled the Rocky Point Road shoreline restoration for 2024, and budgets $1,953,376 for streets and roads in 2026-2027. 321Transit bus fares are $1.50.
Last verified: October 15, 2026, against the sources listed at the end of this page.
Which Malabar roads are state roads, and which does the town maintain?
Malabar's main roads, U.S. 1 and Malabar Road, are state roads that FDOT plans to repave (FDOT project 434414-1), while the Town of Malabar keeps a list of accepted town streets (Accepted Streets list).
FDOT lists U.S. 1 as State Road 5 and Malabar Road as State Road 514 on its Malabar project pages, and it treats Babcock Street, State Road 507, as the west end of the Malabar Road segment it plans to repave.
The town list, titled Public Rights-of-Way Accepted Streets as of 1/25/2024, records each Malabar street the town has accepted with its width and, for many, its length (Accepted Streets list). The Public Works and Town Roads guide in the Malabar government section explains how a road gets added.
Problems on a Malabar town street go to Public Works through its online service request form, which has categories for road maintenance, drainage maintenance and overgrown shrubbery in the right of way, or by phone at Town Hall, 321-727-7764, option 2 (Town of Malabar Public Works). The Public Works Building is at 1435 Centre Street and keeps hours of 7:00 a.m. to 4:00 p.m., Monday through Friday.
What road work does FDOT plan on U.S. 1 and Malabar Road?
FDOT plans to repave the southbound lanes of U.S. 1 through Malabar from north of Rocky Point Road to south of Malabar Road, a 2.561 mile project with a $3.2 million construction estimate and a letting date of July 7, 2027 (FDOT project 452883-1).
The U.S. 1 project is in design at a design cost of $420,000, and FDOT says it will update pedestrian curb ramps where needed to meet current Americans with Disabilities Act standards. It is paired with a second Malabar project: repaving Malabar Road from Babcock Street to U.S. 1, 3.524 miles through Malabar and Palm Bay, with a $570,000 design cost, a $4 million construction estimate and the same July 7, 2027 letting date (FDOT project 434414-1).
| Project | Limits | Length | Construction estimate | Letting |
|---|---|---|---|---|
| 452883-1 | Southbound U.S. 1, north of Rocky Point Road to south of S.R. 514 | 2.561 miles | $3.2 million | July 7, 2027 |
| 434414-1 | Malabar Road, Babcock Street to U.S. 1 | 3.524 miles | $4 million | July 7, 2027 |
| Design cost | U.S. 1 and Malabar Road, in that order | Both in design | $420,000 and $570,000 | Pages updated July 24, 2026 |
Both Malabar project pages name design project manager Jude Jean-Francois at (386) 943-5487 for questions.
What happened to Rocky Point Road in Malabar?
Rocky Point Road in Malabar was rebuilt after the shoreline beside it eroded and parts of the road collapsed: a 2024 contract scheduled shoreline restoration in four areas, and the town planned to repair, repave and restripe the whole road afterward (Rocky Point Road Reconstruction).
The Malabar Town Council approved the work at a special meeting on February 26, 2024. Custom Built Marine Construction, Inc. was scheduled to start April 1, 2024, with completion estimated for September 1, 2024, and docks or private items inside the right of way in the four work areas were removed and not put back. The town told residents to expect lane closures and flaggers throughout construction.
One stale detail on the town page: its project updates still say roadway repair was scheduled to begin August 16 and final paving September 9, with no year attached, so the page reads as if the work were upcoming. The road sits in the town's Coastal Planning Area near the U.S. Highway 1 and Rocky Point Road juncture (Coastal Management Element, page 1), and the plan names the roads in the Rocky Point and Coquina Point subdivisions, with two drainage outfalls, as the public infrastructure in that Coastal Area (page 5). The Rocky Point Road reconstruction in Malabar guide covers the revetment design, the dock removals and the paving.
Which Malabar streets are budgeted for paving in 2026-2027?
The Town of Malabar budget for 2026-2027 lists eleven street and road items, led by $450,000 for road improvements and $189,064 for Benjamin (FY 26/27 capital list), inside a Streets and Roads line of $1,953,376 (budget summary).
| Street or item | Allocation |
|---|---|
| Road Improvements | $450,000 |
| Benjamin | $189,064 |
| Glatter Road | $95,000 |
| Lacourt Lane | $90,000 |
| W. Railroad Ave | $65,000 |
| Howell Road Improvement | $50,000 |
| Blanche Street and Florence Street | $40,000 each |
| Riverview Drive | $28,000 |
| Gilmore Street | $13,886 |
| First Lane | $8,500 |
The budget summary also shows $630,386 in debt proceeds used for road repaving (FY 2026-2027 budget summary). The Malabar budget message describes these as planned capital improvement projects that require additional Town Council approvals (FY 26/27 budget message), and the summary figures come from the budget the town advertised for its September 21, 2026 final hearing.
The same Malabar capital list adds road crew equipment, a $75,000 F350 flat bed with tow package and a $10,500 loader root rake attachment, plus a separate $25,000 Benjamin Widening Project under flood control (FY 26/27 capital list). The budget message says the Malabar Streets and Roads Department has carried two equipment operator vacancies over the last two fiscal years; the medium equipment operator position is omitted for FY 26/27, and recruiting continues for the heavy equipment operator (FY 26/27 budget message).
Is there a bus in Malabar, and where can people walk or bike?
No 321Transit bus route is named for Malabar; the route list names several Palm Bay routes (321Transit routes).
Space Coast Area Transit, branded 321Transit, runs Brevard County's buses, and its route list includes 22 South Palm Bay, 23 West Palm Bay, 25 Melbourne and Palm Bay, and 27 East Palm Bay.
A Malabar rider pays the countywide fares: $1.50 for a full fare ride, $0.75 for a reduced fare, $12.00 for a 10-ride pass and $42.00 for a 30 day pass (321Transit fares). Children under five ride free and transfers cost nothing. TD Paratransit costs $1.50 per ride for those who qualify. The 321Transit site offers a trip planner for finding the stop nearest a Malabar address, and its Palm Bay Park and Ride lot is at 342 Emerson Drive NW in Palm Bay (321Transit).
For walking and cycling, the Al Tuttle Trail is a 10 foot wide paved multi-use trail reached from the Sand Hill Trail Head on Marie Street in Malabar and running along the Malabar Scrub Sanctuary (Space Coast TPO). The town plan also warns that route choices for leaving Malabar in an evacuation are limited (Coastal Management Element, page 6).
How do people get in and out of Malabar, including in a hurricane?
Malabar sits on the Indian River Lagoon near Melbourne Airport, Port Canaveral and I-95, as the town's Florida Trail Town presentation describes it (Malabar Trail Town presentation, page 7).
In a hurricane, the Malabar plan warns that route choices out of town are limited (Coastal Management Element, page 6), and its stated objective is to work with Brevard County toward an evacuation time of less than twelve hours for a Category III storm (Coastal Management Element, page 12). The town's emergency FAQ advises Malabar residents to evacuate early and to travel tens of miles, not hundreds (Town of Malabar emergency FAQ).
For trail users, the Malabar Trail Town presentation sets out a plan to complete the Al Tuttle Trail south to Grant-Valkaria (Trail Town presentation, page 55).
Which Malabar transportation guide answers which question?
The Rocky Point Road reconstruction in Malabar guide is the one deep guide in this section today, and the table points each other Malabar transportation question to its key fact and official page.
| Question | Key fact | Where to read more |
|---|---|---|
| What happened on Rocky Point Road? | Shoreline restored in four areas, 2024 | Rocky Point Road reconstruction in Malabar guide |
| When will U.S. 1 be repaved? | Letting July 7, 2027 | FDOT project 452883-1 |
| When will Malabar Road be repaved? | Letting July 7, 2027 | FDOT project 434414-1 |
| Which town streets are budgeted? | Eleven items, Road Improvements $450,000 | Town FY 26/27 budget |
| What does the bus cost? | $1.50 per ride | 321Transit fares |
Last verified: October 15, 2026, on the Town of Malabar, FDOT and 321Transit websites.
Frequently asked questions
How is a road problem reported in Malabar?
A problem on a Town of Malabar street goes to Public Works through its online service request form or to Town Hall at 321-727-7764, option 2. Malabar Road is State Road 514, which FDOT plans to repave under project 434414-1.
When will U.S. 1 in Malabar be repaved?
FDOT project 452883-1 repaves southbound U.S. 1 from north of Rocky Point Road to south of Malabar Road. It is in design with a letting date of July 7, 2027 and a $3.2 million construction estimate.
Is Rocky Point Road in Malabar open?
The Town of Malabar shoreline restoration on Rocky Point Road was scheduled for April through September 2024, followed by repaving and restriping of the whole road. The town page has no current closure notice, though its update dates lack a year.
How much is the bus fare near Malabar?
321Transit charges $1.50 for a full fare ride and $0.75 for a reduced fare, with a 10-ride pass at $12.00 and a 30 day pass at $42.00. Children under five ride free, and transfers are free.
Sources
- FDOT CFLRoads project 452883-1, Southbound U.S. 1 from north of Rocky Point Road to south of S.R. 514 https://www.cflroads.com/project/452883-1 Used for: length, design cost, letting date, construction estimate, ADA ramps
- FDOT CFLRoads project 434414-1, S.R. 514 (Malabar Road) from Babcock Street to U.S. 1 https://www.cflroads.com/project/434414-1 Used for: length, design cost, letting date, construction estimate
- Rocky Point Road Reconstruction, Town of Malabar Public Works https://www.townofmalabar.org/274/Rocky-Point-Road-Reconstruction Used for: 2024 shoreline restoration, contractor, docks, lane closures, council approval
- Public Works, Town of Malabar https://www.townofmalabar.org/267/Public-Works Used for: service request categories, Public Works Building address and hours, phone option 2
- Town of Malabar Public Rights-of-Way Accepted Streets as of 1/25/2024 https://www.townofmalabar.org/DocumentCenter/View/3178/Town-of-Malabar-Accepted-Roads-2025#page=1 Used for: town accepted street list
- Town of Malabar FY 2026-2027 budget summary, page 6 https://www.townofmalabar.org/AgendaCenter/ViewFile/Agenda/_09212026-123#page=6 Used for: Streets and Roads appropriation and road repaving debt proceeds
- Town of Malabar FY 26/27 capital improvement list, page 12 https://www.townofmalabar.org/AgendaCenter/ViewFile/Agenda/_09212026-123#page=12 Used for: named street paving projects and costs
- Routes and FAQs, Space Coast Area Transit (321Transit) https://321transit.com/routes/ Used for: route list, children under five ride free, free transfers
- Fares, Space Coast Area Transit (321Transit) https://321transit.com/fares/ Used for: fare table
- Al Tuttle Trail, Space Coast TPO https://www.spacecoasttpo.com/what-we-do/planning/trails-program/al-tuttle-trail Used for: 10 foot paved multi-use trail from Marie Street
- Malabar Florida Trail Town presentation (condensed), page 7, hosted by FDEP https://floridadep.gov/sites/default/files/Malabar%20-%20Florida%20Trail%20Town%20condensed.pdf#page=7 Used for: Malabar on the Indian River Lagoon near Melbourne Airport, Port Canaveral and I-95
- Malabar Florida Trail Town presentation (condensed), page 55, hosted by FDEP https://floridadep.gov/sites/default/files/Malabar%20-%20Florida%20Trail%20Town%20condensed.pdf#page=55 Used for: plan to complete the Al Tuttle Trail to Grant-Valkaria
- Town of Malabar Comprehensive Plan, Coastal Management Element, page 12 https://www.townofmalabar.org/DocumentCenter/View/2736/Chapter-5-Coastal-Management-Element#page=12 Used for: evacuation time objective and road capacity policy
- Town of Malabar Comprehensive Plan, Coastal Management Element, page 1 https://www.townofmalabar.org/DocumentCenter/View/2736/Chapter-5-Coastal-Management-Element#page=1 Used for: U.S. Highway 1 and Rocky Point Road juncture, coastal planning area
- Town of Malabar Comprehensive Plan, Coastal Management Element, page 6 https://www.townofmalabar.org/DocumentCenter/View/2736/Chapter-5-Coastal-Management-Element#page=6 Used for: limited evacuation route choices
- Frequently Asked Questions, Emergency Preparedness, Town of Malabar https://www.townofmalabar.org/443/Frequently-Asked-Questions---Emergency-P Used for: evacuate early; travel tens of miles
- Town of Malabar FY 26/27 budget message, agenda packet for September 21, 2026 https://www.townofmalabar.org/AgendaCenter/ViewFile/Agenda/_09212026-123#page=11 Used for: capital projects require additional Town Council approvals
- Coastal Management Element, Town of Malabar Comprehensive Plan (December 2019) https://www.townofmalabar.org/DocumentCenter/View/2736/Chapter-5-Coastal-Management-Element#page=5 Used for: public infrastructure in the Coastal Area
How this page was made
Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.
This page was fact-checked twice before publishing.
If you see an error, or anything you can show is false, tell us right away and we will take a third look.
Report an error
Thank you. We'll take a third look and correct the page if it's wrong.