The SWFWMD flood channel, begun in 1966 after Hurricane Donna, that sends Hillsborough River floodwater around Temple Terrace and Tampa to McKay Bay.


Short answer: The Tampa Bypass Canal was built after Hurricane Donna flooded Tampa in 1960. Under the federal Four River Basins project, ground was broken in 1966 on a canal that runs parallel to the Hillsborough River to McKay Bay. At Structure S-155 near Interstate 75, SWFWMD can close gates, fill a 16,000-acre detention reservoir and send floodwater around Temple Terrace and Tampa instead of through them.

Last verified: October 18, 2026, against the sources listed at the end of this page.

What is the Tampa Bypass Canal?

The Tampa Bypass Canal is a Southwest Florida Water Management District (SWFWMD) flood channel that carries Hillsborough River floodwater around Temple Terrace and Tampa to McKay Bay.

According to the SWFWMD project page, the canal runs parallel to the Hillsborough River and empties into McKay Bay on the east side of Tampa, and several water control structures along it let the District manage the flow of water into and through the channel. It diverts the flood water captured in the upstream reservoir around the two cities instead of letting it pass down the lower Hillsborough.

The canal is one piece of what SWFWMD calls the Tampa Bypass Canal System, together with the Hillsborough Flood Detention Reservoir and the Harney Canal. District sources give different lengths, and the page reports all three rather than choosing one: the project page says approximately 15.7 miles, the SWFWMD recreation page calls it a 14-mile waterway connecting the Lower Hillsborough Wilderness Preserve with McKay Bay, and a 2004 District article describes a canal more than 12 miles long built along with six dams, or flood-control structures.

Why was the Tampa Bypass Canal built after Hurricane Donna?

The canal was built because Hurricane Donna flooded Tampa in 1960 and Florida answered by creating SWFWMD in 1961 to sponsor a federal flood control project.

SWFWMD's history of its first decade records that during the 1960 hurricane season Donna hammered Florida with 128-mph sustained winds and massive flooding, and the District's project page states that Tampa experienced significant river flooding caused by rainfall, runoff and storm surge. The Florida Legislature created the District in 1961 by special act to be the local sponsor of the Four River Basins, Florida Project, and its Board of Governors held its first meeting on August 28, 1961, in Tallahassee.

The Four River Basins project was a $57 million flood control plan designed by the U.S. Army Corps of Engineers for a 6,000-square-mile area including the Hillsborough, Ocklawaha, Peace and Withlacoochee river basins. The Corps designed and constructed the canals, bridges and flood control structures, while the District's job was to acquire the land and agree to operate and maintain the project.

The new District organized around local watersheds. By March 1962, SWFWMD reports, its 11 watershed Basin Boards were organized, including boards for the Hillsborough River and Northwest Hillsborough, and the Governing Board and a staff of three held monthly meetings in a rented Brooksville office. Dale Twachtmann, executive director from 1962 to 1972, recalled that the District immediately began buying land for flood control, including land for the Tampa Bypass Canal and large amounts of acreage for the Lower Hillsborough River Flood Detention Area.

When was the canal built, and how did a drought change it?

SWFWMD dates engineering and recreation planning for the Tampa Bypass Canal to 1963 and the groundbreaking on its first section to 1966.

A District photograph in the same history shows the S-160 Flood Control Structure under construction in 1968, and SWFWMD says the bulk of the canal system was built in the District's first decade. The lower end of the channel follows the Palm River; a SWFWMD release of October 27, 2011 notes that the Palm River is part of the canal, flows from S-160 just north of the Selmon Expressway to the mouth of McKay Bay, and required significant dredging during canal construction in the 1960s. Erosion from that work was identified in the 1970s, and in 1976 Hillsborough County and the District installed rock riprap and vegetation to control it.

Weather turned the other way while the work went on. Memories of Donna faded as the region slipped into drought from late 1962 into 1963, and the District's first executive director recalled residents asking why money was going to flood control when their problem was a lack of rain. The project page adds that residents raised concerns about dry wells, sinkholes and ecological impacts. In 1969 SWFWMD asked Congress to expand the Four River Basins project to add a multipurpose aspect; the District changed the design of the system to help the City of Tampa with its public water supply, and the former director said the change let Tampa use some canal water for drinking water.

One planned feature was dropped. SWFWMD's Lower Hillsborough Wilderness Preserve page explains that the preserve was designed for temporary impoundment of floodwaters, with a levee on its western boundary, a dam on the Hillsborough River and the Tampa Bypass Canal to reroute the water, and that a structural reservoir in the original plan was later abandoned as the value of natural wetlands for flood storage came to be understood.

YearMilestoneSource
1960Hurricane Donna causes widespread flooding in TampaSWFWMD project page
1961Legislature creates SWFWMD; first board meeting August 28 in TallahasseeSWFWMD history
1963Engineering and recreation planning for the canal beginsSWFWMD history
1966First section of the Tampa Bypass Canal breaks groundSWFWMD history
1968S-160 Flood Control Structure under constructionSWFWMD history
1969District asks Congress to add water supply to the projectSWFWMD project page
1976Riprap and vegetation installed against Palm River erosionSWFWMD 2011 release
2004Canal operated three times for 58 days after Charley, Frances and JeanneSWFWMD WaterMatters, 2004

How does the Tampa Bypass Canal protect Tampa from flooding?

The canal protects Tampa by letting SWFWMD close Structure S-155, hold the Hillsborough River in a 16,000-acre detention reservoir and divert the water around Temple Terrace and Tampa.

The project page explains that a 6.5-mile-long earthen dam is associated with the Hillsborough Flood Detention Reservoir, which remains empty until it is needed in times of high water. The river flows through the dam by passing through S-155; closing S-155 stops that flow, the reservoir begins to fill, and water can then be released to the river or diverted to the canal around the two cities.

The District's WaterMatters magazine for November to December 2004 adds the river's scale: nearly 700 square miles drain into the 55-mile-long Hillsborough River, which runs from the Green Swamp north of Lakeland to Hillsborough Bay. It places S-155, the northernmost structure, near where the river intersects Interstate 75 just north of Fletcher Avenue, where two 24-ton gates can redirect all or part of the river flow, accounting for drainage from approximately 452 square miles. Farther downstream, the Harney Canal connects the river to the bypass canal a few miles north of the City of Tampa's dam, and SWFWMD opens it when inflows downstream of the earthen dam cause river flooding, especially when storm surge impedes discharges from the city dam. When not needed for flood control, more than 7,000 acres of the detention area are used by Hillsborough County as a regional park.

The 2004 hurricane season tested the system. After Charley, Frances and Jeanne, the Alafia, Peace and Withlacoochee rivers flooded, but SWFWMD reported that homes and businesses on the lower Hillsborough were spared because of the canal and the flood detention area. That year the canal diverted more than 200 billion gallons from the river, an average of 3.5 billion gallons per day, and ran three times for a total of 58 days, while the District normally operates it once a year in coordination with the City of Tampa.

How is the canal used for water supply and recreation?

The canal doubles as a freshwater supply for the Tampa Bay region and as public land for boating, fishing, hiking and bicycling.

SWFWMD describes the canals as large linear pools of fresh water used by local utilities to supply the region. Tampa Bay Water states that surface water has been treated at its plant since late 2002, and that when available, water is skimmed from the Alafia River, Hillsborough River and the Tampa Bypass Canal; some is treated for immediate use at the Tampa Bay Regional Surface Water Treatment Plant and surplus water is stored in the 15.5-billion gallon Bill Young Regional Reservoir for dry times.

SWFWMD's recreation page divides the canal at SR 60. North of SR 60 the water is fresh, motors up to 10 HP are allowed and the reach is a no-wake zone, with boating access from Harney Canal Park off US 301; south of SR 60 the water is salt and powerboating is allowed with no restrictions, with access from McKay Bay or private ramps. Bank fishing is allowed from public access points and parks along the canal, hiking follows the grassy canal bank from designated access points, and the site is open daily from sunrise to sunset.

Access parkSize and addressFacilitiesOperator
Tampa Bypass/Harney Canal Park12 acres, 7171 North US 301Boat ramp (fees), fishing pier, picnic tables; summer 7 a.m. to 8 p.m., winter 7 a.m. to 6 p.m.Hillsborough County Conservation and Environmental Lands Management (SWFWMD)
Temple Terrace Youth Sports Complex22 acres, 10369 US 301Baseball and soccer complex, primarily for scheduled activitiesTemple Terrace (SWFWMD)
Veteran's Memorial Park and Museum16 acres, 3602 US 301Picnic shelters, restrooms, 0.75-mile paved trail for walking, bicycling and inline skatingHillsborough County (SWFWMD)

Last verified: October 18, 2026, by re-reading the SWFWMD canal system, Tampa Bypass Canal recreation and Lower Hillsborough Wilderness Preserve pages, the District's 1960s history, its 2004 WaterMatters account and 2011 Palm River release, and Tampa Bay Water's surface water page.

Frequently asked questions

Who operates the Tampa Bypass Canal?

The Southwest Florida Water Management District operates and maintains it. The District was created in 1961 as local sponsor of the Four River Basins project, which the U.S. Army Corps of Engineers designed and built, and it coordinates diversions with the City of Tampa.

How long is the Tampa Bypass Canal?

SWFWMD sources vary: its project page gives approximately 15.7 miles, its recreation page says 14 miles from the Lower Hillsborough Wilderness Preserve to McKay Bay, and a 2004 District article says more than 12 miles.

How often is the Tampa Bypass Canal used?

SWFWMD reported in 2004 that it normally operates the canal once a year. In the 2004 hurricane season it ran three times for 58 days and diverted more than 200 billion gallons from the Hillsborough River.

Is Tampa Bypass Canal water used for drinking?

Yes. A 1969 request to Congress added water supply to the project, and Tampa Bay Water says it skims water from the canal, along with the Alafia and Hillsborough rivers, when available, treating some at once and storing surplus in its regional reservoir.

Can boats use the Tampa Bypass Canal?

SWFWMD allows motors up to 10 horsepower in a no-wake zone north of State Road 60, with access from Harney Canal Park off US 301. South of SR 60 the canal is salt water and open to powerboats.

Sources

  1. Tampa Bypass Canal System (SWFWMD) https://www.swfwmd.state.fl.us/projects/tampa-bypass-canal-system Used for: Donna 1960, District 1961, FRB 1966, system components, 16,000 acres, 6.5-mile dam, S-155, 15.7 miles, Harney Canal, 1969 water supply
  2. Tampa Bypass Canal Diverts Billions of Gallons of Water (SWFWMD WaterMatters, November to December 2004) https://www.swfwmd.state.fl.us/blog/watermatters-magazine/8/tampa-bypass-canal-diverts-billions-gallons-water Used for: 2004 operation, 200 billion gallons, S-155 location and gates, 452 square miles, 7,000-acre park, six structures, once-a-year operation
  3. The 1960s: The District’s Beginning (SWFWMD WaterMatters) https://www.swfwmd.state.fl.us/blog/watermatters-magazine/49/the-1960s-the-districts-beginning Used for: Donna statistics, $57 million FRB, first meeting 1961, TBC planning 1963, groundbreaking 1966, S-160 1968, drought, 1969 multipurpose request
  4. Tampa Bypass Canal recreation (SWFWMD) https://www.swfwmd.state.fl.us/recreation/tampa-bypass-canal Used for: 14-mile waterway, fresh and salt water reaches, boating rules, Harney Canal Park, Veterans Memorial Park
  5. Lower Hillsborough Wilderness Preserve (SWFWMD) https://www.swfwmd.state.fl.us/recreation/lower-hillsborough-wilderness-preserve Used for: structural reservoir abandoned, Four River Basins after Donna
  6. Surface Water (Tampa Bay Water) https://www.tampabaywater.org/water-supply/surface-water Used for: TBC as surface water source, C.W. Bill Young Regional Reservoir
  7. Palm River Restoration Gets Under Way (SWFWMD, October 27, 2011) https://www.swfwmd.state.fl.us/the-newsroom/2011/palm-river-restoration-gets-under-way Used for: Palm River part of TBC, S-160, 1960s dredging
Last updated: October 18, 2026

How this page was made

Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.

This page was fact-checked twice before publishing.

If you see an error, or anything you can show is false, tell us right away and we will take a third look.

Report an error
Quote or describe the part that's wrong.
Explain what's actually true.
Only if you'd like a reply. Never shown publicly.

How we fact-check

Continue exploring

Photo credits