Short answer: The City of Tallahassee buys all the output of two solar farms beside Tallahassee International Airport: Solar Farm 1, 20 megawatts on 120 acres, online since 2017, and a second farm online since 2019. Their power backs Tallahassee Solar, a subscription rate of 5 cents per kilowatt hour in place of the fuel charge, fixed until September 30, 2037. The program is fully subscribed and closed.
Last verified: October 18, 2026, against the sources listed at the end of this page.
Where are Tallahassee's city solar farms?
Both solar farms sit on City of Tallahassee property adjacent to Tallahassee International Airport, according to the city's 2026 Ten Year Site Plan filed with the Florida Public Service Commission.
The airport itself is city-owned and sits at 3300 Capital Circle SW. The City of Tallahassee Utilities solar page describes Solar Farm 1 as 20 megawatts on 120 acres and the second farm as twice as big, 40 megawatts on 240 acres, which together bring the city's total solar power generation to 60 megawatts. The farms are not city-owned power plants in the usual sense: the 2026 Tallahassee plan says the city contracted for 100% of the energy output of both farms through power purchase agreements.
When did the two Tallahassee solar farms come online?
Solar Farm 1 began commercial operation on December 13, 2017, and the larger farm on December 26, 2019, according to the City of Tallahassee's 2020 Ten Year Site Plan.
That filing says the city executed a purchase power agreement on July 24, 2016, with Origis Energy USA, doing business as FL Solar 1, LLC, for 20 MW ac of solar. Solar Farm 1 delivers power to a City-owned distribution facility. The second agreement, also with Origis, doing business as FL Solar 4, LLC, covers a facility the city's filings call Solar Farm 4; it is interconnected with the City-owned 230 kV transmission system, and the 2020 Tallahassee plan called it the world's largest airport-based solar facility.
| Farm | Size | Commercial operation | Connection |
|---|---|---|---|
| Solar Farm 1 (FL Solar 1, LLC) | 20 MW on 120 acres | December 13, 2017 | City distribution voltage |
| Solar Farm 4, called Solar Farm 2 on the city's solar page (FL Solar 4, LLC) | 42 MW in the PSC filings; 40 MW on 240 acres on the solar page | December 26, 2019 | 230 kV transmission system |
| Both farms | 62 MW nameplate in the 2026 plan; 60 MW on the solar page | 2017 and 2019 | 100% of output under purchase agreements |
The two official sources disagree on size, and this page reports both rather than choosing. The 2026 site plan lists 62 MW of total nameplate solar, 20 MW for Solar Farm 1 and 42 MW for Solar Farm 4, while the city's solar page lists 40 MW and a 60 MW total.
How does the Tallahassee Solar community program work?
Tallahassee Solar is a rate option, not a rooftop installation: subscribers pay 5 cents per kilowatt hour for solar energy in place of the normal fuel charge, fixed until September 30, 2037, per the city's program page.
Residential and small and medium commercial customers chose to have 25, 50 or 100 percent of their monthly electric bill reflect solar. The city's largest electric customers could instead name a fixed number of monthly kilowatt hours designated as solar. The fuel charge recovers the cost of the natural gas burned in the city's power plants, and the Tallahassee page says it currently hovers around 3.5 cents per kWh, so participants initially pay more. The city expects the fuel charge to rise above 5 cents before September 30, 2037, at which point Tallahassee Solar customers would pay less than non-participants.
The power is not delivered separately. The city says solar energy from the airport farms is fed into the Tallahassee electric grid and replaces energy that would otherwise come from its fossil fuel plants. A household subscribed at the 100 percent level keeps an estimated 5.9 tons of carbon dioxide out of the atmosphere each year, which the city compares to planting 2.4 acres of new forest. Subscriptions move with a customer who stays on the City of Tallahassee electric system, transfers go through Customer Service at 850-891-4968, and a customer who leaves the program can do so without penalty but cannot re-enroll.
Who could sign up for Tallahassee Solar?
Every City of Tallahassee residential and commercial electric customer was eligible, including Solar Net-Metering and Nights and Weekends Pricing customers, according to the program page.
Enrollment is now closed. The city says the program is fully subscribed and that it is not planning a waiting list for future projects. The Tallahassee Electric and Gas Utility's 2025 renewable energy and conservation report to the Public Service Commission adds that the program was fully subscribed by 2022 and has nearly 2,000 participating facilities, including all City of Tallahassee-owned buildings.
Eligibility followed the electric provider, not the city limits. The 2026 site plan says the Electric Utility serves approximately 124,000 customers within a 221 square mile service territory around the city. The 2020 plan describes a territorial agreement with Talquin Electric Cooperative under which each utility provides reciprocal retail service to some of the other's customers, so a Leon County address can fall on either system.
What comes after the airport solar farms in Tallahassee?
The Tallahassee City Commission's Clean Energy Resolution, 19-R-04, sets a target of 100% net, clean renewable energy no later than 2050, according to the city's clean energy plan page.
Smaller projects continue in the meantime. The 2025 PSC report says the Tallahassee utility began installing a 50 kW floating solar system in 2025 over a treated wastewater holding pond at the City's Southeast Farm wastewater facility, and that its Solar Net Metering program has over 1,470 solar interconnections representing 11.6 MW ac of customer-owned generation, credited at full retail value. The 2026 site plan adds that the City anticipates adding battery energy storage within its 10-year planning horizon.
Last verified: October 18, 2026. This check re-read the Tallahassee Solar program page, the clean energy plan page, the Hopkins, Purdom and airport pages on talgov.com, and the City's 2020 and 2026 Ten Year Site Plans and 2025 renewable energy report on the Florida Public Service Commission site.
Frequently asked questions
Can new customers still join Tallahassee Solar?
No. The City of Tallahassee says the program is fully subscribed, enrollment has closed and no waiting list is planned. Existing subscribers keep the 5 cent rate until September 30, 2037.
Does Tallahassee Solar put panels on a subscriber's roof?
No. Subscribers pay a solar rate for a share of the airport farms' output, which is fed into the Tallahassee electric grid. Nothing is installed at the home or business.
How big are the Tallahassee airport solar farms?
The city's solar page lists 20 megawatts on 120 acres and 40 megawatts on 240 acres, 60 megawatts in all. The City's 2026 Ten Year Site Plan lists 20 MW and 42 MW, 62 MW of nameplate solar.
Who built the Tallahassee airport solar farms?
Origis Energy USA, under purchase power agreements as FL Solar 1, LLC and FL Solar 4, LLC, according to the City's 2020 Ten Year Site Plan. The city buys 100% of the output.
When did the Tallahassee solar farms start producing power?
Solar Farm 1 began commercial operation on December 13, 2017, and the second farm on December 26, 2019, according to the City's filing with the Florida Public Service Commission.
Sources
- Tallahassee Solar Program, City of Tallahassee Utilities https://www.talgov.com/you/solar Used for: farm sizes, rate, eligibility, FAQ
- City of Tallahassee Ten Year Site Plan 2020, Florida PSC https://floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2020/City%20of%20Tallahassee.pdf Used for: PPA dates, commercial operation dates, Talquin
- City of Tallahassee 2026 Ten Year Site Plan, Florida PSC https://floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2026/City%20of%20Tallahassee.pdf Used for: 62 MW, 100% output, 737 MW, 20% firm, customers, BESS
- City of Tallahassee Standards Report for Renewable Energy, Efficiency and Conservation 2025, Florida PSC https://floridapsc.com/pscfiles/E-Filings/Public/temp/TAL%20Standards%20Report%20for%20Renewable%20Energy%20Efficiency%20and%20Conservation%202025.pdf Used for: fully subscribed 2022, 2,000 facilities, floating solar, net metering
- Clean Energy Plan, City of Tallahassee https://www.talgov.com/sustainability/cleanenergyplan Used for: 19-R-04
- Arvah B. Hopkins Power Generating Station, City of Tallahassee https://www.talgov.com/you/you-learn-utilities-electric-hopkins.aspx Used for: 504 MW, 1971
- Sam O. Purdom Generating Station, City of Tallahassee https://www.talgov.com/you/you-learn-utilities-electric-purdom.aspx Used for: 242 MW
- Tallahassee International Airport, City of Tallahassee https://www.talgov.com/airport/airport Used for: address
How this page was made
Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.
This page was fact-checked twice before publishing.
If you see an error, or anything you can show is false, tell us right away and we will take a third look.
Report an error
Thank you. We'll take a third look and correct the page if it's wrong.