Short answer: U.S. 1 (State Road 5) is the north to south road along the Sebastian riverfront, passing Riverview Park at Sebastian Boulevard and the turn to the Main Street Boat Ramp. FDOT District 4 will repave 4.222 miles from north of 87 Street to south Sebastian Boulevard from spring 2027 to summer 2028 for $9.2 million, adding 6-foot buffered bike lanes and cutting the posted speed to 45 mph.
Last verified: October 15, 2026, against the sources listed at the end of this page.
What lines U.S. 1 as it runs through Sebastian?
U.S. 1 through Sebastian is State Road 5, Federal Highway (FDOT District 4), and Riverview Park sits on the Indian River shore at its corner with Sebastian Boulevard (City of Sebastian).
Riverview Park is the city's main event ground, at 600 U.S. Highway 1 on the corner of U.S. Highway 1 and C.R. 512/Sebastian Boulevard, on the shore of the Indian River, phone 772-228-7054 (City of Sebastian). It hosts the Clam Bake Festival, the Sebastian Fine Arts and Music Event, the 4th of July Freedom Festival, Shrimpfest and Craft Brew Hullabaloo, and the Rhythm on the River concert series.
The boat launch sits just east of the highway. The Main Street Boat Ramp, part of Main Street Park and Boat Ramp at 1300 Indian River Drive, is at the intersection of Main Street and Indian River Drive just east of U.S. Highway 1, with trailer parking and restrooms (City of Sebastian). Drivers with trailers reach it by turning east off U.S. 1 at Main Street.
| Place | Address | Relation to U.S. 1 | Source detail |
|---|---|---|---|
| Riverview Park | 600 U.S. Highway 1 | Corner of U.S. 1 and C.R. 512/Sebastian Boulevard | Phone 772-228-7054 |
| Main Street Park and Boat Ramp | 1300 Indian River Drive | Just east of U.S. 1 at Main Street | Trailer parking, restrooms |
| Orlando Health Sebastian River Hospital | GoLine Route 5 start | First stop before the Route 5 stops on U.S. 1 | Hourly buses from 6:00 a.m. |
| Sebastian City Hall | 1225 Main Street | On Main Street | Open weekdays 8:00 a.m. to 4:30 p.m. |
The highway belongs to the state, but the city keeps up part of its look. The City of Sebastian Parks Division maintains portions of the medians on U.S. Highway 1, C.R. 512/Sebastian Boulevard and Schumann Drive (City of Sebastian Parks and Recreation). City Hall is at 1225 Main Street and is open Monday through Friday from 8:00 a.m. to 4:30 p.m., closed daily from noon to 1:00 p.m. (City of Sebastian).
What will FDOT change on U.S. 1 in Sebastian in 2027?
FDOT District 4 plans a $9.2 million repaving and restriping of 4.222 miles of U.S. 1 from north of 87 Street to south Sebastian Boulevard, starting in spring 2027 and finishing in summer 2028 (FDOT District 4).
The job is the S.R. 5/US 1/Federal Highway Resurfacing, Restoration, and Rehabilitation (RRR) Project, Financial Number 449812-1-52-01 (FDOT). Its stated purpose is to extend the life of the pavement and improve safety for drivers, pedestrians and cyclists while bringing crosswalks, ramps and pedestrian signals up to Americans with Disabilities Act standards.
| Change | Detail FDOT lists |
|---|---|
| Bike lanes | Restripe for 6-foot wide bike lanes with a painted buffer |
| Speed | Reduce the posted speed to 45 mph |
| Crosswalk lighting | More light at pedestrian crosswalks at signalized intersections |
| ADA | Modify curb ramps and pedestrian push buttons |
| Signs and markings | Replace and upgrade to current standards with higher reflectivity |
| Work hours | Repaving and restriping at night; temporary lane closures |
FDOT says the work will be phased, with access to businesses and residences kept open and pedestrian traffic maintained at all times (FDOT District 4). The project's public meeting was held on Tuesday, August 26, 2025, at 6:00 p.m. at the North Indian River County Library, 1001 Sebastian Boulevard, in person and online. FDOT District 4 lists 954-777-4302 as its communications office line for the U.S. 1 project. Last verified: October 14, 2026, on the FDOT District 4 website.
FDOT lists the 45 mph reduction among the improvements of this project, whose limits end at south Sebastian Boulevard, so U.S. 1 north of Sebastian Boulevard is outside this job (FDOT).
How busy is U.S. 1 near Sebastian?
FDOT counted 24,000 to 30,500 vehicles a day in 2025 on the four U.S. 1 segments it counts from milepost 17.199 north to the Brevard County line (FDOT annual average daily traffic).
FDOT files U.S. 1 as roadway 88010000 and, north of milepost 17.199, labels its count segments by milepost, naming only the Brevard County line at the north end (FDOT). The busiest, milepost 18.808 to 20.303, carried 30,500 vehicles a day; the next segment north carried 30,000; and the final segment, which ends at the Brevard County line at milepost 22.269, carried 24,000. The Sebastian traffic counts guide compares these segments with CR 512 and Roseland Road.
Where do GoLine buses stop on U.S. 1 in Sebastian?
GoLine Route 5 runs hourly along U.S. 1 in Sebastian from Orlando Health Sebastian River Hospital, with stops at U.S. 1 and Davis Street and U.S. 1 and Main Street, and Route 12 stops at U.S. 1 and Schumann Drive (GoLine Route 5).
Route 5 leaves the hospital every hour from 6:00 a.m., stops at Riverwalk Plaza, Davis Street and Main Street on U.S. 1, then turns west on Main Street toward Powerline Road, and on the return trip it also stops at U.S. 1 and Roseland Plaza (Route 5 schedule). Route 12 starts at the Barber Street Publix and reaches U.S. 1 at Whispering Palms and Schumann Drive before continuing along Schumann Drive (Route 12 schedule).
GoLine buses operate weekdays from 6:00 a.m. to 9:00 p.m. and Saturdays from 7:00 a.m. to 7:00 p.m. on most routes (GoLine). Rider questions go to (772) 569-0903, Monday through Friday from 6:00 a.m. to 7:00 p.m.
How has the Sebastian CRA shaped the U.S. 1 riverfront?
The Sebastian Community Redevelopment Agency has funded much of what lines U.S. 1 by the river, from median landscaping to riverfront parking, inside a district that runs from the FEC Railroad east to the city limits (City of Sebastian CRA).
When it was created in 1995, the CRA was bounded on the north, east and south by the city limits and on the west by the FEC Railroad right of way. In 2003 it grew to take in the Sebastian Boulevard Triangle, where C.R. 512 splits into eastbound and westbound lanes, along with industrial land south of C.R. 512 (City of Sebastian). The master plan dates from March 22, 1996, was updated on December 10, 2003 to add the 95-acre triangle and again on October 13, 2010, and was updated again in June 2023 with state Department of Economic Opportunity funding, using a ten year horizon for capital and tax increment projects (City of Sebastian master plan page).
CRA projects the city lists include landscaping of the U.S. Highway 1 medians, additional parking along Indian River Drive and U.S. Highway 1, the Main Street and Indian River Drive realignment with boat ramp repair, and a flag pole project at the western entrance to the CRA, built with a contribution from the Clambake Foundation (City of Sebastian CRA projects).
The district has an end date. Under Florida Statute 163.3755, the Sebastian CRA sunsets on September 30, 2033 unless the City Council approves its continued existence by majority vote (City of Sebastian). With the 2023 plan's ten year horizon running close to that date, any riverfront project the CRA funds along U.S. 1 now falls inside the agency's remaining term or depends on that vote.
Which nearby road projects affect U.S. 1 drivers in Sebastian?
The largest nearby job is the $24,890,000 FDOT widening of 85th Street from Sebastian Boulevard to west of 87th Street, under construction from October 29, 2025 to fall 2028 (FDOT District 4).
That 0.97 mile project widens the road from two lanes to a four lane divided road with seven-foot buffered bike lanes and a six-foot sidewalk, adds new signals at Sebastian Boulevard, Mako Way, Hammerhead Way and 87th Street, and builds a bus transfer facility with six more bus bays (FDOT). FDOT says the road stays open with lane shifts and limited closures, and driveway and street access are maintained.
Closer to the river, FDOT studied C.R. 510 from 58th Avenue to east of US-1 under Financial Number 441692-1-22-01, and its public hearing was held online on April 29, 2025 and on April 30, 2025 (FDOT District 4). One labeling change on the FDOT pages is worth noting: the 85th Street construction page now calls the roads S.R. 510 and S.R. 512/Sebastian Boulevard, while the 2025 study page still uses C.R. 510 (FDOT).
Frequently asked questions
When will FDOT repave U.S. 1 in Sebastian?
FDOT District 4 lists an anticipated start in spring 2027 and completion in summer 2028 for the 4.222 mile S.R. 5/US 1 project from north of 87 Street to south Sebastian Boulevard, at an estimated construction cost of $9.2 million. Paving and restriping are scheduled at night.
Is the speed limit on U.S. 1 in Sebastian changing?
Yes, within the project limits. FDOT lists reducing the posted speed to 45 mph as part of the U.S. 1 resurfacing project between north of 87 Street and south Sebastian Boulevard, together with 6-foot buffered bike lanes.
Where is Riverview Park on U.S. 1 in Sebastian?
The City of Sebastian lists Riverview Park at 600 U.S. Highway 1, on the corner of U.S. Highway 1 and C.R. 512/Sebastian Boulevard along the Indian River. The park phone is 772-228-7054, and it hosts the Clam Bake Festival and Shrimpfest.
Which buses run on U.S. 1 in Sebastian?
GoLine Route 5 runs hourly from Orlando Health Sebastian River Hospital with U.S. 1 stops at Davis Street and Main Street, and Route 12 stops at U.S. 1 and Schumann Drive. GoLine runs weekdays 6:00 a.m. to 9:00 p.m. and Saturdays 7:00 a.m. to 7:00 p.m.
When does the Sebastian CRA end?
The City of Sebastian states that under Florida Statute 163.3755 its Community Redevelopment Agency sunsets on September 30, 2033, unless the City Council votes by majority to continue it. The CRA has paid for U.S. 1 median landscaping and riverfront parking.
Sources
- S.R. 5/US 1/Federal Highway RRR Project, FDOT District 4 https://d4fdot.com/future-projects/s-r-5-us-1-federal-highway-resurfacing-restoration-and-rehabilitation-rrr-project/ Used for: US 1 repaving limits, schedule, cost, improvements, impacts, meeting, contact
- S.R. 510/85th Street Widening Project, FDOT District 4 https://d4fdot.com/projects/county-road-c-r-510-85th-street-widening-project/ Used for: 85th Street widening from S.R. 512/Sebastian Boulevard, schedule, cost, scope
- C.R. 510 PD&E Study from 58th Avenue to East of US-1, FDOT District 4 https://d4fdot.com/future-projects/c-r-510-pde-study-from-58th-avenue-to-east-of-us-1/ Used for: study financial number and hearing dates
- Riverview Park, City of Sebastian https://www.cityofsebastian.org/327/Riverview-Park Used for: address, phone, events
- Main Street Park and Boat Ramp, City of Sebastian https://www.cityofsebastian.org/325/Main-Street-Park Used for: address, ramp location east of US 1
- Parks and Recreation, City of Sebastian https://www.cityofsebastian.org/237/Parks-and-Recreation Used for: median maintenance on US 1
- CRA Projects, City of Sebastian https://www.cityofsebastian.org/251/Projects Used for: US 1 medians, parking, flag pole, Main Street realignment
- CRA Area Development, City of Sebastian https://www.cityofsebastian.org/248/Area-Development Used for: CRA boundaries 1995 and 2003
- CRA Master Plan, City of Sebastian https://www.cityofsebastian.org/247/Master-Plan Used for: plan adoption and update dates, ten year horizon
- Sunsetting the Programs, City of Sebastian CRA https://cityofsebastian.org/250/Sunsetting-the-Programs Used for: 2033 sunset, City Hall address and hours
- Route 5 schedule, GoLine https://www.golineirt.com/route5.html Used for: US 1 stops in Sebastian, hourly
- Route 12 schedule, GoLine https://www.golineirt.com/route12.html Used for: US 1 stops at Whispering Palms and Schumann Drive
- GoLine Indian River Transit https://www.golineirt.com/ Used for: hours and rider phone
- Annual Average Daily Traffic query, US 1 roadway 88010000, FDOT RCI https://gis.fdot.gov/arcgis/rest/services/RCI_Layers/MapServer/0/query?where=ROADWAY%3D%2788010000%27%20AND%20BEGIN_POST%3E15&outFields=YEAR_,COSITE,DESC_FRM,DESC_TO,BEGIN_POST,END_POST,AADT&returnGeometry=false&f=html Used for: 2025 AADT north of milepost 17
How this page was made
Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.
This page was fact-checked twice before publishing.
If you see an error, or anything you can show is false, tell us right away and we will take a third look.
Report an error
Thank you. We'll take a third look and correct the page if it's wrong.



