Bike and Pedestrian Paths in Sebastian, Florida

From the Trans-Florida rail trail to the Riverview Park walkways and the shared use paths planned on the new Sebastian Inlet bridge.


Short answer: Sebastian's off-road routes are the Trans-Florida Central Railroad Trail, the riverfront walkways starting at Riverview Park, trails at Hardee Park and the 163-acre Sebastian Harbor Preserve, and the paved SR A1A path through Sebastian Inlet State Park. County Road 510 is getting 7-foot buffered bike lanes from CR 512 to 87th Street (due December 31, 2026), and the new Sebastian Inlet bridge, let in December 2025, adds two 12-foot shared use paths.

Last verified: October 15, 2026, against the sources listed at the end of this page.

Where can people bike and walk off the road in Sebastian?

Sebastian's main off-road routes are the Trans-Florida Central Railroad Trail, the riverfront walkways from Riverview Park, park trails at Hardee Park and Sebastian Harbor Preserve, and the paved SR A1A path through Sebastian Inlet State Park.

On the river side, the City of Sebastian describes Riverview Park as the starting point for the scenic walkways that follow the shores of the Riverfront District, with oak-covered walkways and views of the Indian River (City of Sebastian). Hardee Park, on the north end of Barber Street on the west side of the Lake Drive Bridge, has a 1/2 mile walking and jogging trail (City of Sebastian). The county's Sebastian Harbor Preserve, a 163-acre tract within the Sebastian Highlands, has walking trails open 7:30am to sunset year-round, with no pets allowed and no parking spaces listed (Indian River County).

Sebastian-area bike and walking routes (official sources, checked October 14, 2026)
RouteWhereUse and key fact
Trans-Florida Central Railroad TrailTrail corridor between Fellsmere and Sebastian Crossings BoulevardBike and walk; county seeks a 4.1-mile extension to US 1
Riverfront walkwaysFrom Riverview Park along the Riverfront DistrictWalking; shaded oak walkways
Hardee Park trailNorth end of Barber Street1/2 mile walking and jogging trail
Sebastian Harbor PreserveSebastian Highlands, 163 acresWalking trails, 7:30am to sunset, no pets
SR A1A pathSebastian Inlet State ParkPaved multi-use path; park calls it 40 miles long
Pelican Island refuge trailsOff Jungle Trail, in the refugeAbout 7 miles; no bicycles

Across the lagoon, Sebastian Inlet State Park runs a multi-use, paved path parallel to state road A1A and, in sections, parallel to the Indian River Lagoon, which the park describes as a 40-mile-long path with numerous beach access points (Florida State Parks).

Where does the Trans-Florida Central Railroad Trail run near Sebastian?

The Trans-Florida Central Railroad Trail runs on a trail corridor between Fellsmere and Sebastian, and the county MPO lists a funded 1-mile Fellsmere segment and a requested 4.1-mile Sebastian segment from Sebastian Crossings Boulevard east to US 1.

The Indian River County MPO's planning consultant still listed the Trans-Florida Rail Trail among the successful existing conditions in the county network in October 2024 (Indian River County MPO minutes).

Fellsmere also has a formal trailhead for recreation. The City of Fellsmere says its Trailhead Preserve and Welcome Center opened on November 3, 2016, northwest of the I-95 and CR-512 interchange, on about 86 acres acquired in 2008 with the Florida Communities Trust and Indian River County (City of Fellsmere).

The next pieces are on the MPO's 2025 priority list. The draft list ranks first a 1.0-mile, 12-foot shared use path on the existing unpaved trail from Broadway Street to St. Sebastian River State Park in Fellsmere, funded for construction, and ranks fourth a 4.1-mile, 12-foot shared use path along the trail corridor from Sebastian Crossings Boulevard to US 1, a County and Sebastian project submitted as a 2025 SUN Trail application (Indian River County MPO draft priority list). Until that eastern segment is built, a rider heading from the trail to the Sebastian riverfront leaves the corridor at Sebastian Crossings Boulevard and uses streets.

Which Sebastian roads are getting new bike lanes, sidewalks or crosswalks?

County Road 510 is getting 7-foot buffered bike lanes and 6-foot sidewalks from CR 512 to 87th Street, CR 512 gets shorter crosswalks at 108 Avenue, and several Sebastian streets are on the county's sidewalk request list.

FDOT's County Road 510 Segment 7, from CR 512 to 87th Street, adds two travel lanes, 7-ft buffered bicycle lanes, 6-ft wide sidewalks on both sides, ADA ramps and countdown pedestrian crosswalk signals; it was let on 8/28/2024 with anticipated completion of 12/31/2026 (FDOT). Segment 8, from 87th Street to west of 82nd Avenue, would add the same bike lanes and sidewalks and upgrade the traffic signal at Treasure Coast Elementary School, but FDOT lists it as not funded for construction (FDOT). That unfunded stretch is the one that passes the Treasure Coast Elementary signal.

On County Road 512, FDOT District Four's widening project from east of I-95 to west of 106 Avenue will reconfigure the pedestrian ramps and crosswalks at 108 Avenue to shorten the distance for pedestrians crossing CR 512 (FDOT District Four). The 0.381-mile project lists a letting date of 12/2/2026, a Winter 2026 start, completion in Summer 2027 and an estimated cost of $2.4 million, with partial pedestrian detours during the crosswalk work. Its public meeting was held August 13, 2025 at the North Indian River County Library on Sebastian Boulevard.

Sebastian sidewalk requests on the draft 2025 MPO priority list
RankStreetFrom and toLength
10Barber StreetEmpire Terrace to Bristol Street0.30 mile, one side
11101st Avenue (county)Sebastian Boulevard/CR 512 to 79th Street2.0 miles, one side
17South Fleming StreetWave Street to west of Arega Street0.32 mile, south side
18South Easy StreetSebastian Boulevard/CR 512 to South Wimbrow Drive0.50 mile, one side

The Barber Street and 101st Avenue entries appear on page 22 of the February 2025 MPO packet (Indian River County MPO), and the South Fleming Street and South Easy Street sidewalks for the City of Sebastian on page 23, none with funding shown (Indian River County MPO). A request on this list is a ranking, not a construction date.

What will the new Sebastian Inlet bridge add for cyclists and pedestrians?

The replacement SR A1A bridge over Sebastian Inlet will carry two 12-foot shared use paths, one on each side, closing what FDOT calls a gap in system linkage for bicyclists and pedestrians.

FDOT's project page lists the new Sebastian Inlet bridge, shifted east of the existing one, with two 12-foot travel lanes, two 8-foot shoulders and two 12-foot shared use paths, plus two fishing pier and observation walks under the bridge (FDOT). South of the inlet the shared use path continues on the west side and a new one is added on the east side, and a crosswalk will cross SR A1A at the State Park's south entrance.

FDOT says the project was let for construction on December 3, 2025, with an anticipated construction start of Spring 2026, an anticipated end of Fall 2031 and an estimated construction cost of $102 Million, and that traffic will be maintained across the inlet at all times (FDOT). As of October 14, 2026 the same page still read that the project is scheduled to start construction in Spring of 2026, so the start date shown there is out of date; the FDOT Treasure Coast Operations office in Fort Pierce, (772) 492-4930, is the contact listed for current work.

What rules apply to bikes on Sebastian-area trails?

Bicycles are not allowed on the Pelican Island refuge trails, pets are barred at Sebastian Harbor Preserve, and Florida law requires helmets for cyclists age 16 and under.

Pelican Island National Wildlife Refuge manages approximately seven miles of trails off Jungle Trail, including the three-quarter-mile ADA accessible Centennial Trail, and states that bicycles are not allowed on trails and that no pets are allowed, only service animals (U.S. Fish and Wildlife Service). The Historic Jungle Trail itself begins in the refuge and winds through 8 miles of barrier island hammock habitat (Florida DEP).

At Sebastian Inlet State Park, three mountain bicycle trails mixing off-road and paved courses begin and end at the park's Bayside Marina, and the park asks riders to check with marina staff before venturing out; it also notes that helmets are highly recommended and that Florida law requires helmets for cyclists age 16 and under (Florida State Parks). Sebastian Harbor Preserve posts no pets, no alcohol and no glass containers (Indian River County).

Who plans bike and pedestrian routes for Sebastian?

The Indian River County Metropolitan Planning Organization plans bicycle and pedestrian routes for Sebastian through its Bicycle and Pedestrian Plan, last updated in 2024.

The MPO says the plan establishes the blueprint for bicycle and pedestrian facility construction and programming for Indian River County, and lists editions from 2024, 2015, 2004 and 1997 (Indian River County MPO). Minutes of the October 1, 2024 committee meeting record the consultant's view of the network: the Trans-Florida Rail Trail, Jungle Trail and SR A1A were the successful existing conditions, while canals, the Airport, no grade separated crossings and limited at-grade crossings were the challenges; the plan cost $160k from the MPO work program (Indian River County MPO minutes).

Last verified: October 14, 2026, on the Indian River County, FDOT and Florida State Parks websites.

Frequently asked questions

Is there a bike trail in Sebastian, Florida?

Yes. The Trans-Florida Central Railroad Trail runs on a trail corridor between Fellsmere and Sebastian, with a 4.1-mile extension from Sebastian Crossings Boulevard to US 1 on the county priority list, and Sebastian Inlet State Park has a paved multi-use path beside SR A1A plus three mountain bike trails starting at its Bayside Marina.

Can bikes ride the trails at Pelican Island National Wildlife Refuge?

No. The U.S. Fish and Wildlife Service says bicycles are not allowed on the refuge trails off Jungle Trail, and pets are not allowed either, only service animals. The refuge manages about seven miles of walking trails, including the ADA accessible Centennial Trail.

Will the new Sebastian Inlet bridge have a bike path?

Yes. FDOT's design includes two 12-foot shared use paths on the new SR A1A bridge, one on each side. The project was let on December 3, 2025, with construction anticipated to end in Fall 2031 at an estimated cost of $102 million.

Where can people walk along the river in Sebastian?

The City of Sebastian's riverfront walkways start at Riverview Park and follow the shore of the Riverfront District along the Indian River. Hardee Park on Barber Street adds a half-mile walking and jogging trail inland.

When will County Road 510 in Sebastian get bike lanes?

FDOT lists the segment from CR 512 to 87th Street, with 7-foot buffered bike lanes and 6-foot sidewalks, for anticipated completion on December 31, 2026. The next segment, from 87th Street past Treasure Coast Elementary to west of 82nd Avenue, is not funded for construction.

Sources

  1. FDOT: SR A1A over Sebastian Inlet Bridge Replacement https://www.fdot.gov/projects/sebastian-inlet-bridge/home-page Used for: shared use paths, purpose, letting date, schedule, cost, contact
  2. Florida State Parks: Sebastian Inlet State Park, Experiences and Amenities https://www.floridastateparks.org/parks-and-trails/sebastian-inlet-state-park/experiences-amenities Used for: A1A multi-use paved path, mountain bike trails, Bayside Marina, helmet law
  3. Indian River County MPO: Bicycle and Pedestrian Plan https://indianriver.gov/services/planning_development_services/metropolitan_planning_organization/bpp.php Used for: plan purpose and editions 2024, 2015, 2004, 1997
  4. Indian River County MPO CAC agenda packet, Feb. 4, 2025, page 5 (Oct. 1, 2024 minutes) https://indianriver.gov/Agenda%20&%20Minutes/MPO%20Citizen/2025/CAC020425A.pdf#page=5 Used for: Bicycle and Pedestrian Master Plan presentation: existing conditions, challenges, $160k cost
  5. Indian River County MPO CAC agenda packet, Feb. 4, 2025, page 22 (draft 2025 List of Priority Projects) https://indianriver.gov/Agenda%20&%20Minutes/MPO%20Citizen/2025/CAC020425A.pdf#page=22 Used for: Transportation Alternatives priorities: Trans-Florida trail segments, Barber Street, 101st Avenue
  6. Indian River County MPO CAC agenda packet, Feb. 4, 2025, page 23 (draft 2025 List of Priority Projects) https://indianriver.gov/Agenda%20&%20Minutes/MPO%20Citizen/2025/CAC020425A.pdf#page=23 Used for: South Fleming Street and South Easy Street sidewalks, 83rd and 79th Street sidewalks
  7. FDOT: County Road 510 Segment 7 (CR 512 to 87th Street) https://www.fdot.gov/projects/cr510/about-the-project-segment-7 Used for: bike lanes, sidewalks, letting, anticipated completion
  8. FDOT: County Road 510 Segment 8 (87th Street to west of 82nd Avenue) https://www.fdot.gov/projects/cr510/about-the-project-segment-8 Used for: not funded for construction, Treasure Coast Elementary signal
  9. FDOT District Four: County Road 512 Widening Project https://d4fdot.com/?p=2177 Used for: crosswalk realignment at 108 Avenue, letting, schedule, cost, public meeting
  10. City of Fellsmere: Fellsmere Trailhead Preserve and Welcome Center https://www.cityoffellsmere.org/community-tourism/page/fellsmere-trailhead-preserve-welcome-center Used for: trailhead location, opening date, acreage
  11. Florida DEP Coastal Access Guide: Indian River County https://floridadep.gov/rcp/coastal-access-guide/content/indian-river-county Used for: Historic Jungle Trail 8 miles
  12. Indian River County: Sebastian Harbor Preserve https://indianriver.gov/business_detail_T21_R59.php Used for: 163 acres, hours, walking trails, rules
  13. U.S. Fish and Wildlife Service: Pelican Island NWR trails https://www.fws.gov/refuge/pelican-island/visit-us/trails Used for: seven miles of trails, Centennial Trail, no bicycles, no pets
  14. City of Sebastian: Parks H through Y https://cityofsebastian.org/337/H-through-Y Used for: Hardee Park half-mile walking and jogging trail, location
  15. City of Sebastian: Riverview Park https://cityofsebastian.org/327/Riverview-Park Used for: starting point for riverfront walkways
Last updated: October 15, 2026

How this page was made

Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.

This page was fact-checked twice before publishing.

If you see an error, or anything you can show is false, tell us right away and we will take a third look.

Report an error
Quote or describe the part that's wrong.
Explain what's actually true.
Only if you'd like a reply. Never shown publicly.

How we fact-check

Continue exploring

Photo credits